A brown-field project to optimise energy and resource usage while reducing carbon emissions with full compliance to required frameworks

Key Project Objectives

  • Multiple energy sources optimisation and carbon reduction
  • Primary : 30% CAPEX and 20% OPEX reduction
  • Secondary : 20% CO₂ Emissions reduction

Outcomes

  • 30% CAPEX reduction
  • 18% OPEX reduction(natural gas)
  • 12% CO₂ emissions reduction
  • 70% reduction in time to reach final design solution

Solution Highlights

  • Project collaboration between Evercomm and Jurong Town Council and Jurong Port
  • Competitor was an internationally acclaimed consultant
  • Final recommendations were implemented at Jurong Port
Multi-Energy System Design, Implementation & Real Time Operation (CHP + Thermal Storage +Solar PV (9.9MW) + Grid)Jurong Port (Singapore)

Overview

Objectives

Browse More Case Studies

Thai_Airways-Logo
Thai Airways
In 2025 Thai Airways replaced siloed departmental tracking with one aviation ESG platform — Scope 1,...
Screenshot 2025-07-24 145236
PUNGGOL DISTRICT INFRASTRUCTURE ENERGY AND EMISSIONS OPTIMISATION
To develop a smart, multi-energy infrastructure
Screenshot 2025-07-25 101650
JURONG PORT ENERGY AND EMISSIONS OPTIMISATION
To develop a smart, multi-energy infrastructure

Chatbot

Hey there 👋
How can I help you today?